{"id":7604,"date":"2019-05-31T13:45:08","date_gmt":"2019-05-31T13:45:08","guid":{"rendered":"https:\/\/www.schneider-fassaden.de\/projekte\/romed-clinic-start-of-installation\/"},"modified":"2021-08-10T11:50:13","modified_gmt":"2021-08-10T11:50:13","slug":"romed-clinic-start-of-installation","status":"publish","type":"projekte","link":"https:\/\/www.schneider-fassaden.de\/en\/projects\/romed-clinic-start-of-installation\/","title":{"rendered":"RoMed Clinic &#8211; Start of installation"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_empty_space][vc_custom_heading text=&#8221;Start of Installation&#8221; font_container=&#8221;tag:h1|text_align:left&#8221; use_theme_fonts=&#8221;yes&#8221;][\/vc_column][\/vc_row][vc_row gap=&#8221;30&#8243;][vc_column width=&#8221;1\/2&#8243;][vc_column_text css=&#8221;.vc_custom_1624349997872{padding-left: 15px !important;}&#8221;]<\/p>\n<p style=\"text-align: right;\"><strong>May 2019<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>Installation of the first window elements.<\/strong> Following a planning phase involving the sampling and production of the first window and facade elements that lasted about half a year, it was now possible to install the first of the planned 134 aluminium windows in the new building of Rosenheim Hospital House 2. Here, we started on the east side in the direction of the inner courtyard, where most of the windows (58) were also installed. Then we continued clockwise, i.e. initially with the south side. We have now arrived at the west side of the building. The aluminium windows are picked up from our pallets for installation by the construction crane on-site, lowered between the scaffolding and the building and then installed from the scaffolding by our facade fitters.<\/p>\n<p style=\"text-align: justify;\">The next step involves installing the mullion and transom facade on the ground floor, at the rounded corner of the southern entrance area. This type of facade will also subsequently run along the south and west sides. Then we proceed up to the roof of the building, where a spacious roof terrace will be located in the future on level 4 in the southern area. The part of the building adjacent to the roof terrace on this level, as well as the attached so-called roof lantern on level 5, will also be clad using a mullion and transom facade made of aluminium and be issued with a venetian blind system as sun protection. Then we proceed once more to the eastern inner courtyard side, where the ventilated curtain facade made of aluminium sheeting is being installed. This will subsequently alternate between the colours dark grey and white across the floors and will then also be installed on the south and west sides, where the motorised sliding shutters from Baier will then also be installed.<\/p>\n<p style=\"text-align: justify;\">Work on the vestibule, the future main entrance, on the ground floor on the south side of the building will also commence at around the same time. A striking element on the new House 2 will be the round beam at the top of the building&#8217;s roof, which will then also be clad in white aluminium sheeting. Towards the end, the vestibule at the entrance area will be completed and the cladding of the building connection to the old part of the building will be installed with a rear-ventilated curtain facade made of fibre cement panels in anthracite.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_media_grid element_width=&#8221;6&#8243; gap=&#8221;15&#8243; grid_id=&#8221;vc_gid:1628594775754-a96a094d-5654-7&#8243; include=&#8221;6469,6463&#8243; css=&#8221;.vc_custom_1628594858342{padding-right: 5px !important;padding-left: 15px !important;}&#8221;][vc_media_grid element_width=&#8221;6&#8243; gap=&#8221;15&#8243; grid_id=&#8221;vc_gid:1628594775755-ae7cd8ce-6e74-5&#8243; include=&#8221;6465,6467&#8243; css=&#8221;.vc_custom_1628595868231{padding-right: 5px !important;padding-left: 15px !important;}&#8221;][\/vc_column][\/vc_row][vc_row el_class=&#8221;projekte-grid-container&#8221; css=&#8221;.vc_custom_1623754309880{padding-right: 15px !important;background-color: #f6f6f6 !important;}&#8221;][vc_column el_class=&#8221;full-tablet&#8221; offset=&#8221;vc_hidden-xs&#8221;][vc_empty_space height=&#8221;30px&#8221; el_class=&#8221;show&#8221;][vc_custom_heading text=&#8221;PROJECT HISTORY&#8221; font_container=&#8221;tag:h2|text_align:left|color:%234c4c4c&#8221; use_theme_fonts=&#8221;yes&#8221; css=&#8221;.vc_custom_1623134013548{margin-bottom: 30px !important;}&#8221;][vc_basic_grid post_type=&#8221;projekte&#8221; max_items=&#8221;-1&#8243; style=&#8221;pagination&#8221; items_per_page=&#8221;2&#8243; element_width=&#8221;6&#8243; order=&#8221;ASC&#8221; arrows_design=&#8221;vc_arrow-icon-arrow_01_left&#8221; arrows_position=&#8221;outside&#8221; arrows_color=&#8221;vista_blue&#8221; paging_design=&#8221;none&#8221; loop=&#8221;yes&#8221; item=&#8221;224&#8243; grid_id=&#8221;vc_gid:1628594775756-0b6c4e54-fa64-6&#8243; taxonomies=&#8221;122&#8243; el_class=&#8221;projekte-grid-container&#8221; css=&#8221;.vc_custom_1623755406735{padding-left: 15px !important;}&#8221;][vc_empty_space height=&#8221;30px&#8221;][\/vc_column][\/vc_row][vc_row el_class=&#8221;projekte-grid-container&#8221; css=&#8221;.vc_custom_1623754447786{padding-right: 30px !important;background-color: #f6f6f6 !important;}&#8221;][vc_column el_class=&#8221;full-tablet&#8221; offset=&#8221;vc_hidden-lg vc_hidden-md vc_hidden-sm&#8221;][vc_empty_space height=&#8221;30px&#8221; el_class=&#8221;show&#8221;][vc_custom_heading text=&#8221;PROJECT HISTORY&#8221; font_container=&#8221;tag:h2|text_align:left|color:%234c4c4c&#8221; use_theme_fonts=&#8221;yes&#8221; css=&#8221;.vc_custom_1623754529910{margin-bottom: 30px !important;padding-left: 15px !important;}&#8221;][vc_basic_grid post_type=&#8221;projekte&#8221; max_items=&#8221;-1&#8243; style=&#8221;pagination&#8221; items_per_page=&#8221;1&#8243; element_width=&#8221;6&#8243; order=&#8221;ASC&#8221; arrows_design=&#8221;vc_arrow-icon-arrow_01_left&#8221; arrows_position=&#8221;outside&#8221; arrows_color=&#8221;vista_blue&#8221; paging_design=&#8221;none&#8221; loop=&#8221;yes&#8221; item=&#8221;224&#8243; grid_id=&#8221;vc_gid:1628594775757-fad4ef8e-bab9-7&#8243; taxonomies=&#8221;122&#8243; css=&#8221;.vc_custom_1623755420657{padding-left: 30px !important;}&#8221;][vc_empty_space height=&#8221;30px&#8221;][\/vc_column][\/vc_row][vc_row gap=&#8221;30&#8243;][vc_column width=&#8221;1\/3&#8243; offset=&#8221;vc_col-xs-6&#8243;][\/vc_column][vc_column width=&#8221;1\/3&#8243; offset=&#8221;vc_col-xs-6&#8243;][\/vc_column][vc_column width=&#8221;1\/3&#8243;]<div class=\" ubtn-ctn-right \"><a class=\"ubtn-link ult-adjust-bottom-margin ubtn-right ubtn-block \" href=\"https:\/\/www.schneider-fassaden.de\/en\/project-news\/\" ><button type=\"button\" id=\"ubtn-7470\"  class=\"ubtn ult-adjust-bottom-margin ult-responsive ubtn-block ubtn-no-hover-bg  none  ubtn-right   tooltip-69ff7eaa704be ubtn-block\"  data-hover=\"\" data-border-color=\"\" data-bg=\"#f6f6f6\" data-hover-bg=\"\" data-border-hover=\"\" data-shadow-hover=\"\" data-shadow-click=\"none\" data-shadow=\"\" data-shd-shadow=\"\"  data-ultimate-target='#ubtn-7470'  data-responsive-json-new='{\"font-size\":\"desktop:40px;\",\"line-height\":\"\"}'  style=\"font-weight:bold;border:none;background: #f6f6f6;color: #017955;\"><span class=\"ubtn-data ubtn-icon\"><i class=\"none\" style=\"font-size:32px;color:#017955;\"><\/i><\/span><span class=\"ubtn-hover\" style=\"background-color:\"><\/span><span class=\"ubtn-data ubtn-text \" >&amp;lt;&amp;lt;&amp;lt; Back to overview<\/span><\/button><\/a><\/div>[\/vc_column][\/vc_row]<\/p><\/div>","protected":false},"excerpt":{"rendered":"<p>Installation of the first window elements. Following a planning phase involving the sampling and production of the first window and fa\u00e7ade elements that lasted about half a year, it was now possible to install the first of the planned 134 aluminium windows in the new building of Rosenheim Clinic House 2. <\/p>\n","protected":false},"author":15,"featured_media":6465,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false},"categories":[77,138],"tags":[],"material":[81,141,82],"land":[92],"nutzung":[139],"class_list":["post-7604","projekte","type-projekte","status-publish","format-standard","has-post-thumbnail","hentry","category-ongoing-projects","category-romed-clinic-house-2-rosenheim","material-aluminium-en","material-fibre-cement-en","material-glass-en","land-germany-en","nutzung-health"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/projekte\/7604","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/projekte"}],"about":[{"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/types\/projekte"}],"author":[{"embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/users\/15"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/media\/6465"}],"wp:attachment":[{"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/media?parent=7604"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/categories?post=7604"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/tags?post=7604"},{"taxonomy":"material","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/material?post=7604"},{"taxonomy":"land","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/land?post=7604"},{"taxonomy":"nutzung","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/nutzung?post=7604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}