{"id":7615,"date":"2020-10-31T10:59:32","date_gmt":"2020-10-31T10:59:32","guid":{"rendered":"https:\/\/www.schneider-fassaden.de\/projekte\/romed-clinic-project-completed\/"},"modified":"2021-08-10T11:23:23","modified_gmt":"2021-08-10T11:23:23","slug":"romed-clinic-project-completed","status":"publish","type":"projekte","link":"https:\/\/www.schneider-fassaden.de\/en\/projects\/romed-clinic-project-completed\/","title":{"rendered":"RoMed Clinic &#8211; Project completed"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_empty_space][vc_custom_heading text=&#8221;Project completed&#8221; font_container=&#8221;tag:h1|text_align:left&#8221; use_theme_fonts=&#8221;yes&#8221;][\/vc_column][\/vc_row][vc_row gap=&#8221;30&#8243;][vc_column][vc_column_text css=&#8221;.vc_custom_1628593229781{padding-right: 5px !important;padding-left: 15px !important;}&#8221;]<\/p>\n<p style=\"text-align: right;\"><strong>October 2020<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>Facade project has been completed.<\/strong> We are delighted with the successful acceptance of our performance for the new building of House 2 of the RoMed Clinic in Rosenheim, Germany and the completion of the remaining facade works. After almost two years of planning, production and installation work, the new building and at the same time the new entrance area of the hospital presents itself to the outside world in a state-of-the-art merger of glass and aluminium. The building is mainly characterised by the striking stylistic elements such as the round building corners, the round beam above the roof terrace and the interplay between white and grey-anthracite elements.<\/p>\n<p style=\"text-align: justify;\">A total of 134 aluminium windows were installed, including 118 punched windows and 15 insert elements within the 700 m\u00b2 mullion and transom facade on the ground floor and the roof. Furthermore, an area of 2,500 square metres of rear-ventilated smooth sheet aluminium facade was installed and an area of 180 square metres was erected as a rear-ventilated fibre cement facade. The work also included 19 doors, 17 of which were manual and two electrically operated telescopic sliding doors, as well as the sun screen, which was realised on the windows with sliding shutters and on the mullion and transom facades with external venetian blinds, and a smoke extraction system.<\/p>\n<p style=\"text-align: justify;\">At the same time, other contract work sections have already started work to complete the interior fittings, outdoor facilities, etc., ensuring there is nothing to prevent the surgical and internal intensive care units of the hospital from moving in at the start of 2021.<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row gap=&#8221;30&#8243;][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;6537&#8243; img_size=&#8221;1600&#215;1100&#8243; css=&#8221;.vc_custom_1624257485285{padding-left: 15px !important;}&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;6539&#8243; img_size=&#8221;1600&#215;1100&#8243; css=&#8221;.vc_custom_1624257522633{padding-right: 5px !important;padding-left: 15px !important;}&#8221;][\/vc_column][\/vc_row][vc_row el_class=&#8221;projekte-grid-container&#8221; css=&#8221;.vc_custom_1623754309880{padding-right: 15px !important;background-color: #f6f6f6 !important;}&#8221;][vc_column el_class=&#8221;full-tablet&#8221; offset=&#8221;vc_hidden-xs&#8221;][vc_empty_space height=&#8221;30px&#8221; el_class=&#8221;show&#8221;][vc_custom_heading text=&#8221;PROJECT HISTORY&#8221; font_container=&#8221;tag:h2|text_align:left|color:%234c4c4c&#8221; use_theme_fonts=&#8221;yes&#8221; css=&#8221;.vc_custom_1623134013548{margin-bottom: 30px !important;}&#8221;][vc_basic_grid post_type=&#8221;projekte&#8221; max_items=&#8221;-1&#8243; style=&#8221;pagination&#8221; items_per_page=&#8221;2&#8243; element_width=&#8221;6&#8243; order=&#8221;ASC&#8221; arrows_design=&#8221;vc_arrow-icon-arrow_01_left&#8221; arrows_position=&#8221;outside&#8221; arrows_color=&#8221;vista_blue&#8221; paging_design=&#8221;none&#8221; loop=&#8221;yes&#8221; item=&#8221;224&#8243; grid_id=&#8221;vc_gid:1628593217187-d55bc722-3918-4&#8243; taxonomies=&#8221;122&#8243; el_class=&#8221;projekte-grid-container&#8221; css=&#8221;.vc_custom_1623755406735{padding-left: 15px !important;}&#8221;][vc_empty_space height=&#8221;30px&#8221;][\/vc_column][\/vc_row][vc_row el_class=&#8221;projekte-grid-container&#8221; css=&#8221;.vc_custom_1623754447786{padding-right: 30px !important;background-color: #f6f6f6 !important;}&#8221;][vc_column el_class=&#8221;full-tablet&#8221; offset=&#8221;vc_hidden-lg vc_hidden-md vc_hidden-sm&#8221;][vc_empty_space height=&#8221;30px&#8221; el_class=&#8221;show&#8221;][vc_custom_heading text=&#8221;PROJECT HISTORY&#8221; font_container=&#8221;tag:h2|text_align:left|color:%234c4c4c&#8221; use_theme_fonts=&#8221;yes&#8221; css=&#8221;.vc_custom_1623754529910{margin-bottom: 30px !important;padding-left: 15px !important;}&#8221;][vc_basic_grid post_type=&#8221;projekte&#8221; max_items=&#8221;-1&#8243; style=&#8221;pagination&#8221; items_per_page=&#8221;1&#8243; element_width=&#8221;6&#8243; order=&#8221;ASC&#8221; arrows_design=&#8221;vc_arrow-icon-arrow_01_left&#8221; arrows_position=&#8221;outside&#8221; arrows_color=&#8221;vista_blue&#8221; paging_design=&#8221;none&#8221; loop=&#8221;yes&#8221; item=&#8221;224&#8243; grid_id=&#8221;vc_gid:1628593217188-009a5ac7-abf1-2&#8243; taxonomies=&#8221;122&#8243; css=&#8221;.vc_custom_1623755420657{padding-left: 30px !important;}&#8221;][vc_empty_space height=&#8221;30px&#8221;][\/vc_column][\/vc_row][vc_row gap=&#8221;30&#8243;][vc_column width=&#8221;1\/3&#8243; offset=&#8221;vc_col-xs-6&#8243;][\/vc_column][vc_column width=&#8221;1\/3&#8243; offset=&#8221;vc_col-xs-6&#8243;][\/vc_column][vc_column width=&#8221;1\/3&#8243;]<div class=\" ubtn-ctn-right \"><a class=\"ubtn-link ult-adjust-bottom-margin ubtn-right ubtn-block \" href=\"https:\/\/www.schneider-fassaden.de\/en\/projekt-news\/\" ><button type=\"button\" id=\"ubtn-2052\"  class=\"ubtn ult-adjust-bottom-margin ult-responsive ubtn-block ubtn-no-hover-bg  none  ubtn-right   tooltip-69ff7ec79dd3e ubtn-block\"  data-hover=\"\" data-border-color=\"\" data-bg=\"#f6f6f6\" data-hover-bg=\"\" data-border-hover=\"\" data-shadow-hover=\"\" data-shadow-click=\"none\" data-shadow=\"\" data-shd-shadow=\"\"  data-ultimate-target='#ubtn-2052'  data-responsive-json-new='{\"font-size\":\"desktop:40px;\",\"line-height\":\"\"}'  style=\"font-weight:bold;border:none;background: #f6f6f6;color: #017955;\"><span class=\"ubtn-data ubtn-icon\"><i class=\"none\" style=\"font-size:32px;color:#017955;\"><\/i><\/span><span class=\"ubtn-hover\" style=\"background-color:\"><\/span><span class=\"ubtn-data ubtn-text \" >&amp;lt;&amp;lt;&amp;lt; Back to overview<\/span><\/button><\/a><\/div>[\/vc_column][\/vc_row]<\/p><\/div>","protected":false},"excerpt":{"rendered":"<p>Facade project has been completed. We are delighted with the successful acceptance of our performance for the new building of House 2 of the RoMed Clinic in Rosenheim, Germany and the completion of the remaining facade works. After almost two years of planning, production and installation work, the new building and at the same time the new entrance area of the hospital presents itself to the outside world in a state-of-the-art merger of glass and aluminium.<\/p>\n","protected":false},"author":15,"featured_media":6539,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false},"categories":[77,138],"tags":[],"material":[81,141,82],"land":[92],"nutzung":[139],"class_list":["post-7615","projekte","type-projekte","status-publish","format-standard","has-post-thumbnail","hentry","category-ongoing-projects","category-romed-clinic-house-2-rosenheim","material-aluminium-en","material-fibre-cement-en","material-glass-en","land-germany-en","nutzung-health"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/projekte\/7615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/projekte"}],"about":[{"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/types\/projekte"}],"author":[{"embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/users\/15"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/media\/6539"}],"wp:attachment":[{"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/media?parent=7615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/categories?post=7615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/tags?post=7615"},{"taxonomy":"material","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/material?post=7615"},{"taxonomy":"land","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/land?post=7615"},{"taxonomy":"nutzung","embeddable":true,"href":"https:\/\/www.schneider-fassaden.de\/en\/wp-json\/wp\/v2\/nutzung?post=7615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}