Material: Glass

Hager ForumOBERNAI In 2015, the building technology specialist Hager opened a training and meeting centre on the site of Europe's largest production site in Obernai, Alsace. Schneider designed, manufactured and installed the mullion and transom [...]

Hager Forum – Obernai

Read More
48 Leicester SquareLONDON Only the historical facade made out of Portland limestone was preserved in this massive refurbishment project in the middle of London's West End. Schneider installed new window and facade elements and was [...]

48 Leicester Square – London

Read More
25 Wilton RoadLONDON The area around Victoria Station was never one of London's more exclusive districts. As part of a restoration concept, many buildings such as the former Parnell House were upgraded. Gebrüder Schneider designed, [...]

25 Wilton Road – London

Read More
Rathbone SquareLONDON For the project developer Great Portland Estates, the demolition of the Royal Mail's old distribution centre in Fitzrovia in the heart of London provided the opportunity to create a new place for people [...]

Rathbone Square – London

Read More
InselhalleLINDAU The conference hall Inselhalle Lindau that was constructed in 1981, could no longer offer a contemporary ambience for conferences and congresses. An integrated concept unites the existing and new buildings under a common polygonal [...]

Inselhalle – Lindau

Read More
Lincoln SquareLONDON Living in the best location! Numerous institutions and universities such as the famous King's College and the Covent Garden theatre district are located near the 10-storey luxury residential complex with its 230 apartments [...]

Lincoln Square – London

Read More
OSZ Lise-Meitner-SchoolBERLIN Gebrüder Schneider implemented the design by Numrich Albrecht Klumpp Architekten for the building envelope of the Lise Meitner School for the Berlin Senate Department for Urban Development and Housing. In addition to a [...]

OSZ Lise-Meitner-School – Berlin

Read More

Final spurt of the last work on the diagrid facade. Around 50% of the diagrid facade has been fully completed and successfully accepted by the client to date. The construction lift has now been completely dismantled and at the same time the last insertion openings have been closed with the facade elements that are still absent, so that the diagrid structure is now also visible on the narrow side of the building.

Newfoundland Tower London – Final Spurt

Read More